Astrid 1

Sweden

Spacecraft nº:

Swedish spacecraft nº: 4


Launch data:

Designation 23464 / 95002B
Launch date 24 Jan 1995 at 03:54 UT
Launch site Plesetsk, LC132
Launch vehicle  Cosmos-3M
Mission Scientific:ionosphere and magnetosphere study
Earth orbit:
Perigee/Apogee 965 / 1026 km
Inclination 82.9°
Period 105 min

The satellite will initially be controlled from Swedish Space Corporation′s ground station at ESRANGE in Kiruna in Northern Sweden. Thereafter control will be taken from Esrange, by the Swedish Institute of Space Physics in Kiruna.

The payload, which will emphasize studies of energetic neutral particles in the Earth's magnetosphere, includes PIPPI, the neutral particle imager; MIO, the miniature UV imaging system (with optical, UV continuum and Lyman alpha monitors) and EMIL, an electron spectrometer.

Specifications:

Prime contractor Platform: Swedish Space Corporation's Science Systems Division in Solna
Payload: Swedish Institute of Space Physics in Kiruna
PlatformFreja C
OperatorSwedish Space Corporation
Mass at launch 28 kg
Mass in orbit  
Length 0.45 m
Width 0.45 m
Height 0.4 m
Solar array 4 wings, silicon
Stabilization spin stabilized
DC power 28 V +-4v
Design lifetime 3 months

Instruments power supply failed after 5 weeks, last contact on 27 Sep 1995.

End of life

Out of serviceMar 1995
Causeshort circuit
Decay  


UHF-band (400.55 MHz)

Main transponders
Backup transponders
Power 2 W
Bandwidth 50 kHz
Coverage omnidirectional
EIRP max -12-0 dB
Polarization RHCP
Data flow 8 kbps

S-band (2208.1629 MHz)

Main transponders
Backup transponders
Power 2 W
Bandwidth 890 kHz
Coverage omnidirectional
EIRP max -6- 2 dB
Polarization RHCP
Data flow 128 kbps

External links:


Ref.: #15, #101, #228 - update: 05.12.18 Home